Plant Engineering has a 500-ton and a 210-ton crane arriving to UNC Hospitals on Friday – April 6, 2018 at 5 p.m. as part of the 5 Children’s Protective Environment construction project. The cranes will remain on-site the entire weekend. As a result, elevators W/C 10, W/C 11, and W/C 12 will be “Out Of Service” beginning Friday, April 6, at 11 p.m.


Plant Engineering has a 500-ton and a 210-ton crane arriving to UNC Hospitals on Friday – April 6, 2018 at 5 p.m. as part of the 5 Children’s Protective Environment construction project. The cranes will remain on-site the entire weekend. As a result, elevators W/C 10, W/C 11, and W/C 12 will be “Out Of Service” beginning Friday, April 6, at 11 p.m.

  • For basement and second Floors – Elevators W/C 7, W/C 8, and W/C 9 will still be operational and should be used during this time.
  • For fourth, fifth, sixth and seventh Floors – Elevators W/C 1, W/C 2, W/C 3, W/C 4, W/C 5 and W/C 6 will still be operational and should be used during this time.

Maps locating the affected elevators may be found here and here.

We apologize for any inconvenience and thank you for your understanding as we work to carry out the hospital’s vision of being the nation’s leading public academic health care system.