Power Outage in Burnett-Womack
There will be a planned electrical power outage on March 10 in the Burnett-Womack Building as part of a five-year check.
The first outage will be from 8 to 10 a.m., and then the power will come back on for an hour. The second outage will be from 11 a.m. to 1 p.m. The emergency power will be on the entire time.
Filed under:
Construction
