Ground floor Support Tower/Anderson Pavilion elevator lobby renovation May 1 - 11

From 5 p.m. Friday, May 1, to 7 a.m. Monday, May 11, a portion of the ground floor Support Tower/Anderson Pavilion elevator lobby will be partitioned off due to renovation work. The renovation work will be in front of the two ground floor Support Tower elevators (ST1 and ST2). Therefore, only the two Anderson Pavilion elevators located in the same lobby will be accessible from the ground floor. Both sets of elevators will be available on the remaining floors.

The attached drawing shows the area that will be inaccessible.

Filed under: