Crane at Neurosciences Hospital loading dock Aug. 29

A crane will be placed at the Neurosciences Hospital loading dock from 6 a.m. to 5 p.m. on Aug. 29 for the installation of HVAC ductwork. Vehicular access to the Women's and Children's and Anderson Pavilion loading docks will remain open.

The Shelco, LLC, superintendent on site will be Todd Johnson (336-399-0996).

Filed under: