APCF/Bedtower scheduled partial power outage

A scheduled limited Normal power outage is to occur in APCF/Bedtower on Thursday, Feb. 16, from approximately 10 p.m. to 6 a.m. the following morning.

This is one in the series of several planned electrical outages that are necessary for the electrical system upgrades currently underway in APCF/Bedtower. We will provide notification before the outage and also communicate directly with any inpatient units that may be affected.

During this outage, in some areas, only emergency power will be available. This means that power to the normal power outlets (ivory-color electrical outlets) will not be available. Emergency power will be provided to red color electrical outlets. This outage will not affect emergency power service to these buildings; however, brief “blips” may occur. Any critical equipment should be connected to red outlets prior to the outage. If there are specific concerns about whether your equipment is on emergency power, please contact the Plant Engineering Electrical Shop at 966-4484 prior to the outage.

Please contact the Plant Engineering Admin. offices at 966-5211 or Plant Engineering Maintenance at 966-4484 if you have any questions or concerns.

Filed under: