Planned Hot Water Outage in 4th – 9th floor Bedtower for four hours on night of April 12

Plant Engineering must turn off the hot water system from the 4th – 9th floors of the Bedtower from 9 p.m. Thursday, April 12, until approximately 1 a.m. Friday, April 13, to repair a leak on the hot water loop on the 9th floor.

Please plan accordingly with your staff and patient’s needs. Contact Keith Morris at 984-974-0328 if you have any questions concerning this needed repair.

Filed under: